


- #Zoeller battery backup sump pump installation driver
- #Zoeller battery backup sump pump installation zip
The Backup Sump Float assembly can be attached to the pipe anywhere it doesn’t interfere with the main sump pump float or hit something else. With the two pipes 1/2″ apart you will be able to slip the flexible fitting back on and connect #1B to #2. Then we will cut the remaining piece of “Pipe Piece #1” into piece #1B which is cut so that it fits within a half inch or so of “Pipe Piece #2”. The backup pump will be cemented to the offshoot of the T. The first piece will be #1A which we will first cement the PVC T-fitting onto it and adjust the height of the backup pump above the main pump. We will cut “Pipe Piece #1” into two pieces. To do this we will disconnect “Pipe Piece #1” which is seated into rubber fittings and held by pipe clamps on both ends–seated into the check valve on the bottom and into the flexible coupling on the top. What we are going to do is add an extra pump in line with the current sump pump. I will refer to this diagram and the naming of the pvc pipe pieces by the terms mentioned in the diagram above. Here is a diagram that gives you an idea of before and after the battery backup sump pump installation: Battery Backup Sump Pump Installation–Before & After Diagram
#Zoeller battery backup sump pump installation zip
Flush-Cut pliers (for trimming zip ties).Channel Lock Pliers (very handy for opening the stuck lids of cans of pvc cement).Pipe Saw (but most fine-toothed saws will cut pvc).

5/16 socket (for the pipe clamps) – get this socket and much more in this 170-piece tool set.Treble Light with LED bulb (I recommend a treble light with LED bulb so it doesn’t burn out on you when you bump it-I was using my uncles fluorescent light in this repair).
#Zoeller battery backup sump pump installation driver
